Recent plans Regarding Power Plants in BD
« on: August 11, 2014, 11:13:59 AM »
The Ministry of Power and Energy has been mobilising Tk 40,000 crore ($5.88 billion) to generate 5,000 MW of electricity to reduce load shedding into a tolerable level within next four and half years during the term of the present government. Under the plan, the Power Development Board (PDB) would produce 500 MW gas-fired electricity between July and December 2009 to over come load shedding within December. The PDB would hire furnace-oil based 1,000MW of electricity from private sector from January to June 2010, the plan said. In 2011, the government would install furnace-oil based 800 MW capacity of power plant. The PDB officials would seek suitable place to establish the plant, a senior official of the PDB said. Besides the government would also hire another diesel or furnace oil based power plant having capacity of 700 MW in 2012 to keep load shedding into mild level, the official said. However, the government also contemplates to establish four coal-fired based power plants with capacity of producing 500 MW of electricity each with public and private partnership (PPP) in Rajshahi and Chittagong region. The government has initially tried to create fund of Tk 6,000 crore ($1 billion) to implement the plan, sources said. The power division has tried to utilise the government's budgetary allocation of Tk. 2000 crore for PPP in this regard, sources added. "If we can create the fund of Tk. 6,000 crore, it would be possible also to mobilise Tk 40,000 crore under ppp to produce 5,000 MW of electricity within four and half years," PDB chairman ASM Alamgir Kabir told the New Nation on 29 June 2009. During the meeting, Prime Minister Sheikh Hasina permitted the power division to implement the PDB plan to reduce load shedding up to a tolerable level. Prime Minister's Adviser for Power and Energy Dr Tawfiq-e-Elahi Chowdhury Bir Bikram, State Minister for Power and Energy Shamsul Haque Tuku, Power Division Secretary Md Abul Kalam, PDB Chairman ASM Alamgir Kabir were present.
Utpal Saha
Lecturer, Dept of EEE
Faculty of Engineering
ID: 710001154

Offline abdussatter

  • Sr. Member
  • ****
  • Posts: 373
  • Test
    • View Profile
Re: Recent plans Regarding Power Plants in BD
« Reply #1 on: August 11, 2014, 03:29:06 PM »
Informative post. keep post on..
(Md. Dara Abdus Satter)
Assistant Professor, EEE
Mobile: 01716795779,
Phone: 02-9138234 (EXT-285)
Room # 610

Offline utpalruet

  • Full Member
  • ***
  • Posts: 213
  • Test
    • View Profile
Re: Recent plans Regarding Power Plants in BD
« Reply #2 on: August 11, 2014, 10:56:14 PM »
thank you. I will try to keep it continuing.
Utpal Saha
Lecturer, Dept of EEE
Faculty of Engineering
ID: 710001154

Offline mahmud_eee

  • Hero Member
  • *****
  • Posts: 591
  • Assistant Professor, EEE
    • View Profile
Re: Recent plans Regarding Power Plants in BD
« Reply #3 on: August 12, 2014, 03:12:03 PM »
informative.....may you inform us about present loss in system
Md. Mahmudur Rahman
Assistant Professor, EEE
FE, DIU

Offline utpalruet

  • Full Member
  • ***
  • Posts: 213
  • Test
    • View Profile
Re: Recent plans Regarding Power Plants in BD
« Reply #4 on: August 12, 2014, 04:19:00 PM »
I will try to give a post regarding the present loss ASAP.