Water logging Dhaka

Author Topic: Water logging Dhaka  (Read 1531 times)

Offline Sheikh

  • Jr. Member
  • **
  • Posts: 55
  • Test
    • View Profile
Water logging Dhaka
« on: August 23, 2017, 10:06:32 AM »
Recent water logging in Dhaka City has shown us the negative effect of not considering water as a important and fundamental element in the planning process. DAP (2005-2015), Dhaka structure plan (2016-2035) put some objectives,policies,implementation tools etc regarding a better Dhaka, which is rarely followed. Some steps from Govt. give us hope (Hazaribag Tannery shift, Central Jail shift etc.) but always the steps are taken around 15-20 years later of its desired time. Some drastic changes are required for the betterment of the city- revive all canals, water body, circular waterway, wide pedestrian walkway around the city, planned public transport etc.

Offline protima.ns

  • Sr. Member
  • ****
  • Posts: 429
  • Test
    • View Profile
Re: Water logging Dhaka
« Reply #1 on: October 01, 2017, 08:38:57 PM »
Thanks.

Offline munira.ete

  • Hero Member
  • *****
  • Posts: 558
  • Test
    • View Profile
Re: Water logging Dhaka
« Reply #2 on: December 19, 2017, 05:56:53 PM »
 :)

Offline murshida

  • Hero Member
  • *****
  • Posts: 1163
  • Test
    • View Profile
Re: Water logging Dhaka
« Reply #3 on: March 12, 2018, 12:36:30 PM »
good