Industrial Attachment: Spinning process
Fiber
• Fibre purchasing system
• Types of fibre used in spinning mill
• Mostly used fibre in spg mill( if possible collect percentage)
• fibre price (according to fibre types)
• Last two years fibre price
• Per consignment no of bales
• per bale wt
• Fibre storage capacity according to mill
• How many no. of bales are stored all time in the mill.
• What process is done when bale is kept in the store?
• Spinning limit
Process:
In Blow roomline_
• Atmospheric condition of B/R
• Effect of RH% on product quality
• Working procedure of all machines in B/R line( when maintenance is done see all the machine parts and their function)
• Production capacity of B/R line
• Production calculation of B/R line
• No. of m/c needed in B/R line
• No. of bales per lay down
• Production capacity of individual machine.
• How to use monitor for individual machine
• Lay out of B/R line.
• Model no. of machine
• Individual m/c study for product quality.
• Faults of B/R line
• Recent developments of B/R line
• Wastage of B/R & their names.
• Function of chute feed system
• Function of different sensor
• Bale management technique for knit and woven and their importance.
• Problems of b/r machinery.
• Carding:
• Model no. of machine
• Production calculation
• Production capacity
• Speed of feed r/r, T-in, cyl, doffer, etc
• Gearing calculation
• Function of different sensor
• Recent developments
• Measurement of NRE%
• Different gauge setting.
• Problems created into the carding m/c
• Wastage of carding & their names.
• Count calculation of sliver.
Drawframe & comber
• Same as carding
• Doubling system and importance.
• Can coiling system
• Process sequence
• Can color (carding to simplex)
• Autolevelling
Simplex & Ring frame
• Model no. of machine
• Production calculation
• Production capacity
• Recent developments
• Bobbin color
• Wastage
• Gearing calculation
• Automation
• Process control
• RH%
• End breakage rate calculation
•
Autoconer:
• Function
• Monitor setting
• Working principle(capacitance & optical)
• Machine parts with their function
• Splicing system & strength of splicing place compared to main yarn
• Package weight
• Cone color
• Wastage
Finishing sector:
• Supervising & checking all the product
• Instrument used
General instruction:
• Lay out plan
• Spin plan
• Machine erection
• Floor height
• Man power calculation
• Cost calculation
Quality:
• Principle of all machines
• Meaning of all sheets.
• Decision making from test result
Mechanical & Electrical
• M. schedule
• If don’t follow then what effect
• Power consumption
• Power supply system
• Function & working principle--& capacity calculation
• Gas generator
• Air compressor
• Dryer
• Humidification plant
• Boiler
• Chiller
• Motor
• Pump
• Fibre deposit plant (FDP)
• etc