Bath Rooms
} Essentially correct Uniform Floor Slope towards Water Outlet.
} Foreign made Sanitary Wares in all Bathroom except servant’s toilet (Cotto or RAK or equivalent).
} Full height wall Glazed tiles in all bathrooms (RAK / C B C or Equivalent) except servant’s toilet.
} Matching floor tiles in Bathrooms (RAK / C B C or Equivalent)
} All Mirrors in Bathrooms with overhead Lamps.
} Good Quality Chrome plated Fittings (Nazma/Gloria/ Equivalent).
} All Chrome plated Fittings carry Manufacture’s Warranty.
} Porcelain soap cases and Towel Rails.
} Cabinet Basin with marble top in Master Bath.
} One Bathtub in Master Bathroom (Ariston or Equivalent).
} Titles on Floor and Wall up to 7 feet in Maid’s bath with Long pan, shower and Lowdown.
} Provision for exhaust fan in all bathrooms.
} Concealed Hot and Cold water lines in Master Bath, 2nd Bath & 3rd bath.
Floors & Verandah
} Mirror polish Homogeneous Tiles in Floors (RAK or C B C or Equivalent, Size 16â€x16â€).
} Tiles in Stair, Lobby & Verandah (C B C / RAK or Equivalent, size 16â€x16â€).
Walls
} Outside walls are plastered 00'-10''’ standard brickwork (1st class).
} All interior walls are also plastered 5' brickwork (1st class).
} Walls separating apartments are 00'-10'' brickwork (1st class)
} Smooth Finish Walls.
} Walls below ground are water proof RCC.
Painting & Polishing
} Plastic paint in all internal walls and ceilings in soft colors (Berger or Equivalent).
} French polished Doorframes & shutters.
} Exterior wall will be Weather coat paint (Berger or Equivalent).
Electrical
} MK (Singapore) or Equivalent electrical Switches, plug points and other Fittings.
} Fancy Light Fixtures in all Rooms.
} Three emergency lights and three Fans in each Apartment.
} Independent electric meter in each apartment.
} Electrical distribution box with main switch circuit breakers.
} Concealed electrical wring (BRB/PARADISE or Equivalent).
} All power outlets with ear-thing connection.
} Provision for air conditioner in master bed, 2nd bed and living area.
} Emergency power in lifts, lobby, inter COM service, common spaces like car parking, reception area, security room and main gate.
} concealed fan hook.
Doors
Main Door:
} Solid teak (Chittagong) decorative Main Entrance Door with lucrative chains, spy holes, calling bell switch, solid brass doorknocker, apartments no. In brass plate, doors handle with security Lock)
Door frame:
} Main door frames (00'-10'') are made of Chittagong Teak.
Internal Door:
} Internal doors are made of strong and durable Flush door with polish & good quality Mortis Lock
} All internal doorframes are of Chapalish/ Tick Shamble/ Shilkarai. (Covered
Bathroom Doors:
} Waterproof laminated door.
Windows
} Sliding Windows as per Architectural Design of the Building
} 5 mm thickness glass with mohair lining
} Rain water barrier in 4†Aluminum sections
} Safety grills in all windows
} Fly proof net in all windows
Kitchen
} Impressively designed platform with Marble / Granite top.
} Provision for double burner gas out let.
} Space provision for gas oven, washing machine & refrigerator.
} Partly tiles in the kitchen wall (Matching Glazed tiles)
} Suitably placed exhaust fan.
} One stainless steel sinks with mixture for washing purpose.
} Concealed water line for hot and cold water.
} Gas burners are surrounded by wall tiles up to 5 feet.
} Floor covered with homogeneous tiles (RAK/CBC or Equivalent).
:: MAJOR STRUCTURAL MATERIALS
Steel
} Deformed Bar
} Manufactured by:
i. Bangladesh Steel & Re-Rolling Mills Ltd. (BSRM)
ii. Rahim Steel mills Ltd.
iii. Bashudhara Steel Ltd.
iv. Other Equivalent High Standard Steel Mills Ltd.
Cement
} Manufactured by
i. M/S. Cemex (Bangladesh) Ltd. : Cemex Cement
ii. M/S. Meghna Cement Mills Ltd. : King Brand
iii. Other Equivalent High Standard Manufacturer
Aggregates
} Stone Chips for all columns, beams, foundations & other will be Bricks chips.
} High strength Bricks Chips from automatic Gas Fired picked Bricks from Gazipur.
Bricks
} First Class Bricks
Sand
} 2.5 FM Coarse Sand
} 1.5 FM Medium
:: General Amenities of Apartment
} Reserved Car parking in covered & protected Ground floor for residents with comfortable Driveways.
} Electricity supply approx. 220V/440V from DESA source with separate main cable and LT panel/distribution board.
} Water supply connection from WASA sufficient as per total calculated consumption.
} Underground water reservoir with one main lifting pump and standby pump.
} Sewerage system planned for long-term requirement.
} Gas pipeline connection from TITAS distribution system as per total calculated consumption, adequate safety measures incorporated.
} Termite protection treatment of ground.
} A fire extinguisher on each floor.