How you will develop the concept of satellite city

<< < (2/3) > >>

kafi:
Thanks Sony. Next day I will discuss the key point of this project  step by step

kafi:
Here is some important key word of project planning which is frequently uses in real estate project management system as well as students must know the definition while they are going to initiating any project. It’s a common feature to work out the plan implementation procedure and necessary preparation on assign project base work. Its such an important delegation tools for all student of BRE, preliminary preparation and finalize the work schedule to make a higher order project building scheme. This short guide line will help to introduce individual project builders.


Guide line of project planning

•   Project Justification
•   Cost/Benefit Analysis
•   Baseline Measurements
•   Project Planning and detail area survey

a. Select and prepare team

b)Risks and Mitigation Strategies
i) . Risk Identification
ii). Risk Review
iii). Risk Analysis
iv). Mitigation
•   Develop a Project Plan
•   Analyze Requirements
•   Current Work flow Diagram
•   Architecture and land use Overview
•   Infrastructure Review
•   Vendor Selection
•   Review Committee
•   Vendor Presentations
•   Analyze Vendor Packages
•   Pilot Test Findings and
•   Best Practices

contd//

kafi:
Satellite city Project implementation out line

This is common intervention owing to know the project development method if need to be a good prospective and out come of the project we must develop the guide line which is badly needed for implementation including comprehensive decision –support from the earlier stage of development of constructive procedure.

I. Initial Development Services
       A. Project-Needs Analysis
       B. Master Planning
       C. Site Planning
       D. Feasibility Studies
       E. Master Project Schedule
       F. Master Project Budget
       G. Financial Planning
       H. Architect/Engineer Consultant Team Selection
 
II: Design Phase
       A. Consultant Agreements and Invoices
       B. Programming
       C. Schematic Design
       D. Design Development
       E. Schedule
       F. Budget
       G. Quality Control
       H. Value Engineering
       I. Final Drawings
       J. Regulatory Approvals
       K. Building Permits
       L. Site Development
 
III. Construction Phase
       A. Documents & General Contractor Selection
       B. Construction Documents
       C. General Contractor Selection
       D. Agreements and Invoices
       E. Bid Package Preparation and Review
       F. Notice to Proceed
 
IV. Development Services
       A. Pre-construction Meeting
       B. Job Site Meetings
       C. Change Orders
       D. Site Conditions
       E. Schedule
       F. Budget
       G. Quality of Work
       H. Materials Testing Program
       I. Contractor Negotiations and Invoices
       J. Project Cost Reports
 
V: Project Close-Out & Move-In
       A. Completion of Final Punch List
       B. Regulatory Inspections
       C. Certificate of Occupancy
       D. Close-out Documents
       E. Moving Company Selection
       F. Move Planning and Meetings
       G. Move-in

contd//

mir:
I appreciate you endevour on the concept of Satellite City. I have been keeping an eye on it on regular basis. Please keep it up and help build the concept among our community.

shibli:
I bear the same view with Masud bhai. Mr. Kafi, keep it up.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version