    Capacity
Capacity = 60 / Capacity time in minute

    Cycle Time
Cycle Time = 60 / Team target

    Team target
Team target = (Work hour/SMV) * Present operator * Organizational efficiency

    Capacity Achievable
Capacity Achievable = Capacity * Balance

    Balance
Balance = BPT / Bottle neck time (BNT)

    Standard time
Standard time = Net operation time * (1 + Ratio of loss time)

    Daily output
Daily output = Work hour / SMV



    Factory capacity
Factory capacity = (Work hour / SMV) * Total worker * Working day * Efficiency


    CPM
CPM = (Total over head cost of the month / No of SMV earners * Work minutes) *Efficiency 



    Required no of operator
Required no of operator = Target daily output / Daily output per operator


    CM of garments
CM of garments = Total production / (No of worker * Work hour)


    Marker Efficiency
Marker Efficiency = (Total area of marker / Total area of lay) * 100


    CPD (Consumption per dozen)
CPD = Marker length * Marker width * GSM * 12 / (1000 * 100 * 100 * Total marker pc’s)

Title: Re: some IE formula use in garments production
Post by: tamim_saif on November 21, 2012, 01:03:23 PM
Thanks for the post.
Title: Re: some IE formula use in garments production
Post by: tawhidhp93 on November 13, 2016, 07:41:42 PM
useful post. tnx for this
Title: Re: some IE formula use in garments production
Post by: smriti.te on November 27, 2016, 12:57:19 AM
Helpful post...