Daffodil International University
Faculties and Departments => Faculty Sections => Faculty Forum => Topic started by: Sheikh on March 31, 2019, 11:19:21 AM
-
"In this narrow world, the building does not always have to be on the ground, building it can be on the road, building it can be underground. This is an example we create when the land does not allow us to do the skywalk,“
-- Ridwan Kamil, Mayor, Bandung
Project completion: 2017
skywalk in Cihampelas shopping destination
450m/ long, road width of 9m/ 29.5 ft and height 4.6m/ 15 ft
to manage the huge number of street vendors in the Cihampelas area
construction materials: H-Beam and concrete type steel on the floor, granite and wood pedestal
Facilities: public toilets, mosques, information posts, souvenir shop, culinary attractions
-
Nice post.
-
Informative.